top of page

Greengate HJ&K
Salford

Project Leads
Steve Ravenscroft & Robert Drabot

Client

 

Renaker Build Limited

Appointment

Mechanical, electrical and public health engineering services support for the hybrid planning application of all three phases of this development and RIBA Stage 1 to 4 design of plots HJ and K comprising Phase 1

Project Construction Value 

TBC​

Description

  • Plot HJ is a major residential development incorporating gym, swimming pool and amenity facilities

  • Plot K is the redevelopment of an existing graveyard into a park

  • 143m residential block of 53 storeys with circa 559 apartments in total

  • 825m² of commercial space

  • Two levels of basement carpark

  • Development area equates to circa 0.49 hectare

  • Located in the Greengate area of Salford

Duties

 

Detailed design to RIBA Stage 4 for mechanical and electrical and to Stage 5 for public health building services; utilities load assessments; CIBSE TM59 overheating risk analysis; tender appraisal; construction phase monitoring including reviewing specialist sub-contractor calculations and technical submissions, site inspections, witnessing of testing and commissioning.

Site is bounded by Greengate (road) and Abito Building (with south service road) to the north, Collier Street to the west, Queen Street to the south and Gravel Lane to the east

bottom of page